The mining schedule is based on conditions such as a reasonable advance relationship in the mining sequence, the production capacity of the ore block, and the preparation time of the new level. Generally, it should be compiled from the year when the mine is put into production to reach the design capacity, and the annual mining plan and the mining grade after the production is completed, and the workload and schedule will be digged year by year.
As a general rule, the mining schedule is compiled by the design department and reaches the mine along with the preliminary design. The mining production department then plans the annual and quarterly mining operations according to the mining schedule to guide production.
Chapter 1 Requirements for the preparation of the mining schedule
Section 1 Purpose of the plan
(1) In order to verify the year-on-year development of mining recovery and mining work;
(2) On the basis of production verification, further verify whether the mine can reach the designed production capacity within the predetermined time limit according to the mining technical conditions, and whether it can continue to stabilize production after reaching the designed production capacity;
(3) The order in which the ore bodies, stages and ore blocks are harvested, the annual ore production and quality, and the date on which the mine is put into production and the juice production is reached;
(4) Determine the level of advancement required for the mining of the cutting work;
(5) Determine the number of personnel and equipment required for mining work.
Section 2 Requirements for the preparation of the plan
The mining schedule is essentially the specificization of all mining design technology decisions, and is the main basis for other professional design. Therefore , in the preparation of the mine must be combined with the characteristics of each mine , to make detailed and detailed arrangements; plan to reflect the party's mining technology policy; the various technical production quotas used in the plan, to be practical and feasible; completed during the planning period The amount of work should be as balanced as possible; and the plan must be both average and advanced.
Charts and captions should be clear and accurate.
SZL series chain grate boiler
Our company SZL type boiler is a double-drum water tube assembly chain grate boiler. The boiler proper has an upper drum and a bottom drum longitudinally arranged along the boiler center. The front of the upper drum and two sides water wall tubes constitute the boiler hearth radiation heating surface, and the tubes between the rear of the upper drum and the bottom drum constitute the convection heating surface. The economizer is arranged on the rear of the boiler,part of heat from high temperature exhaust gas generated by burning was absorbed by economizer, then the exhaust gas go through the cooling chamber,exhaust gas enters the convection heating surface to transfer heat power again, and through economizer,dust collector, finally draught by ID fan to Chimney,discharges into the atmosphere.
Core Technology:
1. Longitudinally arranged double drum
2. Airtight and uniform-pressure wind room
3. Customized combustion device
4. "α" type flame combustion
5. High quality aluminum silicate insulation
6. Built-in dust cleaning
7. Easy operation control system
Biomass Steam Boiler,Industrial Biomass Steam Boiler,Chain Grate Biomass Boiler,Chain Grate Biomass Steam Boiler,Automatic Biomass Boiler
Henan Yuanda Boiler Co., Ltd. , https://www.industrysboiler.com